Systematic dismantling of generation and auxiliary electrical assets after retirement or major redevelopment.
Create a system-based register covering generator step-up, station service, excitation, auxiliary, unit, grounding, instrument, and control transformers. Add nameplate ratings, oil volumes, tap changers, bushings, coolers, dimensions, weights, and serial numbers.
The teardown sequence should follow approved switching and isolation procedures, address stored electrical and mechanical energy, verify zero energy, and coordinate protective grounding and work boundaries. Retired status does not prove that all sources, backfeeds, induced voltages, or capacitors are safe.
Environmental planning should distinguish mineral or ester fluid from PCB status and should use appropriate sampling and laboratory documentation. Define containment, decontamination, transport, and disposal responsibilities with the owner and qualified environmental contractors rather than assuming any equipment buyer performs them.
Quote demolition, rigging, heavy haul, access, salvage preparation, testing, and documentation as separate scopes. Include plant drawings, outage history, asbestos or hazardous-material surveys, and site restrictions where available.