Estimate Removal, Rigging, and Freight.
A checklist for turning a transformer’s physical characteristics and site constraints into a realistic logistics scope.
Collect dimensions, shipping weight, oil quantity, center of gravity, lifting points, skid or base details, removable radiators, bushings, cabinets, and accessories. Clarify whether weight is dry, filled, assembled, or estimated.
Survey doors, corridors, stairs, elevators, roof openings, crane reach, floor loading, turning radii, overhead lines, and road access. Photos with measurements are more useful than a general statement that access is good.
Separate drain-down, disassembly, packing, rigging and loading responsibilities. For installed equipment, coordinate the logistics plan with qualified electrical personnel and the site’s safety rules. We cover freight for equipment we purchase.
Use a written scope that states who supplies cranes, trailers, spill kits, blocking, weather protection, and temporary covers. Equipment value should not be confused with a turnkey removal price.
For a unit-specific discussion, send the nameplate, current condition, Wisconsin pickup location and the information you have available.