Plan Safe Deenergization and Removal.
An owner-side planning guide for making removal scope explicit without performing electrical work instructions in the field.
Identify every possible source, including utility feeders, secondary feeds, generators, UPS systems, capacitors, control power, batteries, induced voltage, and backfeed. The responsible electrical authority should define the switching order and the work boundary.
OSHA guidance treats equipment as energized unless the required deenergization, lockout or tagging, verification, and other controls are completed. A qualified person must test exposed parts and account for inadvertent voltage or backfeed before work proceeds.
Include protective grounding, remote-device disablement, arc-flash boundaries, access control, rigging, and reenergization checks in the contractor scope. Do not rely on a control switch, interlock, or a verbal statement that the equipment is off.
For a quote, state who supplies qualified electrical labor, rigging, permits, outage coordination, and site supervision. An equipment purchase does not replace the facility’s safety program.
For a unit-specific discussion, send the nameplate, current condition, Wisconsin pickup location and the information you have available.